Report Overview

The Australia data centre construction market is estimated to be valued at AUD 3.64 billion in 2024. It is expected to grow at a CAGR of 5.54% between 2025 and 2034 to reach almost AUD 6.24 billion by 2034.

2024

Base Year

2018-2024

Historical Year

2025-2034

Forecast Year

  • According to the United States International Trade Commission, Australia accounts for 3% of the global data centre share.
  • According to the ABS Labour Force Survey, 80,900 individuals were employed in the telecommunication services sector in May 2024.
  • In May 2024, OVHcloud inaugurated its third data centre in Sydney, Australia, further bolstering the growth of the data centre construction market.

Australia Data Centre Construction Market Growth

Compound Annual Growth Rate

Value in AUD billion

5.54%

2025-2034


Australia Data Centre Construction Market Outlook

*this image is indicative*

Based on infrastructure, mechanical systems led the Australia data centre construction market by driving the development of advanced power distribution solutions, such as modular power distribution units, ensuring reliable power supply to servers.

Advanced mechanical systems like HVAC (Heating, Ventilation, and Air Conditioning) and cooling systems are essential for data Centres, ensuring efficient operation and reliability to maintain optimal conditions for servers and equipment. Sophisticated electrical systems, such as power distribution units (PDUs) and uninterruptible power supply (UPS) systems, allow data Centres to increase their capacity in response to rising needs for computing and storage.

Australia Data Center Construction Market Report Summary Description Value
Base Year AUD billion 2024
Historical Period AUD billion 2018-2024
Forecast Period AUD billion 2025-2034
Market Size 2024 AUD billion 3.64
Market Size 2034 AUD billion 6.24
CAGR 2018-2024 Percentage XX%
CAGR 2025-2034 Percentage 5.54%
CAGR 2025-2034 - Market by Region New South Wales 6.3%
CAGR 2025-2034 - Market by Region Australian Capital Territory 5.3%
CAGR 2025-2034 - Market by Type Electrical Infrastructure 6.2%
CAGR 2025-2034 - Market by Size Small and Medium Size Data Centre 6.1%
2024 Market Share by Region New South Wales 35.1%

Australia Data Centre Construction Market Report

The Australia data centre construction market development is driven by several factors. To reduce environmental impact, there is a rising trend towards sustainable data Centres featuring energy-efficient designs and renewable energy resources. Additionally, the integration of security systems, such as encryption technologies and biometric access controls, is increasing to mitigate cyber threats to data Centres. Moreover, for rapid deployment in diverse locations, containerized data Centres install IT infrastructure within shipping containers. Furthermore, to meet data processing demands and enhance connectivity, the usage of 5G networks in data Centres is increasing. On May 2024, OVHcloud, a European cloud provider launched its third data Centre in Sydney, Australia.

Australia Data Centre Construction Market Segmentation

"Australia Data Centre Construction Market Report And Forecast 2025-2034" offers a detailed analysis of the market based on the following segments:

Market Breakup by Infrastructure

  • Electrical Infrastructure
    • UPS Systems 
    • Others
  • Mechanical Infrastructure
    • Cooling Systems 
    • Racks
    • Others
  • General Infrastructure

Market Breakup by Size

  • Small and Medium Size Data Centre
  • Large Data Centre

Market Breakup by Tier Type

  • Tier I and II
  • Tier III
  • Tier IV

Market Breakup by End Use

  • BFSI
  • IT and Telecom
  • Healthcare
  • Government and Defence
  • Others

Market Breakup by Region

  • New South Wales
  • Victoria
  • Queensland
  • Australian Capital Territory
  • Western Australia
  • Others

Australia Data Centre Construction Market Share

The BFSI sector holds a significant share of the Australia data centre construction market due to its large data volumes necessitating secure storage, compliance with stringent regulations, meeting high-security standards, supporting digital banking and AI innovations, and providing robust risk management solutions.

CAGR 2025-2034 - Market by Region
New South Wales 6.3%
Australian Capital Territory 5.3%
Victoria XX%
Queensland XX%
Western Australia XX%
Others XX%

Leading Companies in the Australia Data Centre Construction Market

The growth of data centre construction market is fuelled by the rising digital transformation, cloud adoption, edge computing, increase in internet usage, and renewable energy initiatives.

  • AirTrunk Operating Pty Ltd.
  • Multiplex Constructions Pty Limited
  • Fujitsu Australia Limited
  • Procore Technologies, Inc.
  • Kapitol Ltd.
  • Nilsen Pty Ltd.
  • Kajima Australia Pty Ltd. (ICON)
  • DXN Limited
  • Others

*While we strive to always give you current and accurate information, the numbers depicted on the website are indicative and may differ from the actual numbers in the main report. At Expert Market Research, we aim to bring you the latest insights and trends in the market. Using our analyses and forecasts, stakeholders can understand the market dynamics, navigate challenges, and capitalize on opportunities to make data-driven strategic decisions.*

Looking for specific insights?

Get in touch with us today for customized, data-driven solutions tailored to your unique requirements!

Key Questions Answered in the Report

The market was valued at AUD 3.64 billion in 2024.

The market is projected to grow at a CAGR of 5.54% between 2025 and 2034.

The revenue generated from the data centre construction market is expected to reach AUD 6.24 billion in 2034.

Based on the infrastructure, the data centre construction market is bifurcated into mechanical infrastructure, general infrastructure and electrical infrastructure.

Key players in the data centre construction industry are AirTrunk Operating Pty Ltd., Multiplex Constructions Pty Limited, Fujitsu Australia Limited, Procore Technologies, Inc., Kapitol Ltd., Nilsen Pty Ltd., Kajima Australia Pty Ltd. (ICON), and DXN Limited, among others.

Based on size, the data centre construction market is divided into small and medium sized data Centre and large data Centre.

Based on the tire type, the data centre construction market is bifurcated into tier I and II, tier III, and tier IV.

The market is broken down into New South Wales, Victoria, Queensland, Australian Capital Territory, Western Australia, and others.

Report Summary

Explore our key highlights of the report and gain a concise overview of key findings, trends, and actionable insights that will empower your strategic decisions.

Key Highlights of the Report

Please note that the figures mentioned in the description serve as estimates and may vary from the actual figures presented in the final report.

Report Features Details
Base Year 2024
Historical Period 2018-2024
Forecast Period 2025-2034
Scope of the Report

Historical and Forecast Trends, Industry Drivers and Constraints, Historical and Forecast Market Analysis by Segment:

  • Infrastructure
  • Size
  • Tier Type
  • End Use
  • Region
Breakup by Infrastructure
  • Electrical Infrastructure
  • Mechanical Infrastructure
  • General Infrastructure
Breakup by Size
  • Small and Medium Size Data Centre
  • Large Data Centre
Breakup by Tier Type
  • Tier I and II
  • Tier III
  • Tier IV
Breakup by End Use
  • BFSI
  • IT and Telecom
  • Healthcare
  • Government and Defence
  • Others
Breakup by Region
  • New South Wales
  • Victoria
  • Queensland
  • Australia Capital Territory
  • Western Australia
  • Others
Market Dynamics
  • SWOT
  • Porter's Five Forces
  • Key Indicators for Demand
  • Key Indicators for Price
Competitive Landscape
  • Market Structure
  • Company Profiles
    • Company Overview
    • Product Portfolio
    • Demographic Reach and Achievements
    • Certifications
Companies Covered
  • AirTrunk Operating Pty Ltd.
  • Multiplex Constructions Pty Limited
  • Fujitsu Australia Limited
  • Procore Technologies, Inc.
  • Kapitol Ltd.
  • Nilsen Pty Ltd.
  • Kajima Australia Pty Ltd. (ICON)
  • DXN Limited
  • Others

How To Order

Our step-by-step guide will help you select, purchase, and access your reports swiftly, ensuring you get the information that drives your decisions, right when you need it.

Select License Type

Choose the right license for your needs and access rights.

Click on ‘Buy Now’

Add the report to your cart with one click and proceed to register.

Select Mode of Payment

Choose a payment option for a secure checkout. You will be redirected accordingly.

Pricing Plans

Purchase Full Report

Datasheet

 

USD 2199

USD 1999

tax inclusive*

  • Selected Sections, One User
  • Printing Not Allowed
  • Email Delivery in PDF
  • Free Limited Customisation
  • Post Sales Analyst Support
  • 50% Discount on Next Update
Single User License

One User

USD 3299

USD 2999

tax inclusive*

  • All Sections, One User
  • One Print Allowed
  • Email Delivery in PDF
  • Free Limited Customisation
  • Post Sales Analyst Support
  • 50% Discount on Next Update
Five User License

Five Users

USD 4399

USD 3999

tax inclusive*

  • All Sections, Five Users
  • Five Prints Allowed
  • Email Delivery in PDF
  • Free Limited Customisation  
  • Post Sales Analysts Support 
  • 50% Discount on Next Update
Corporate License

Unlimited Users

USD 5499

USD 4999

tax inclusive*

  • All Sections, Unlimited Users
  • Unlimited Prints Available
  • Email Delivery in PDF + Excel
  • Free Limited Customisation
  • Post Sales Analysts Support
  • 50% Discount on Next Update

Connect For More Information

Our expert team of analysts will offer full support and resolve any queries regarding the report, before and after the purchase.

Our expert team of analysts will offer full support and resolve any queries regarding the report, before and after the purchase.

We employ meticulous research methods, blending advanced analytics and expert insights to deliver accurate, actionable industry intelligence, staying ahead of competitors.

Our skilled analysts offer unparalleled competitive advantage with detailed insights on current and emerging markets, ensuring your strategic edge.

We offer an in-depth yet simplified presentation of industry insights and analysis to meet your specific requirements effectively.

Why Choose Us

We ensure that you get unmatchable competitive advantage by providing detailed insights about the existing market scenario as well as the emerging and high growth markets.

Serving customers
across the world

Regions and Countries with the Highest Number of Returning Clients

85%

Projects delivered with customization

90%

Projects involving industry specific expertise

24x7

Analysts Support

500+

Corporates choose us as their preferred partner

Commitment to Excellence

Diverse Teams

Innovative Solutions

Client Centric Approach

Continuous Improvement

Back to top

We’re here to help answer any questions about our products and services.

Contact us
Get In Touch  
Locations

United States (Head Office)

30 North Gould Street, Sheridan, WY 82801

+1-415-325-5166

Australia

63 Fiona Drive, Tamworth, NSW

+61 448 06 17 27

India

C130 Sector 2 Noida, Uttar Pradesh 201301

+91-120-433-0800

Philippines

40th Floor, PBCom Tower, 6795 Ayala Avenue Cor V.A Rufino St. Makati City,1226.

+63 287899028, +63 967 048 3306

United Kingdom

6 Gardner Place, Becketts Close, Feltham TW14 0BX, Greater London

+44-753-713-2163

Vietnam

193/26/4 St.no.6, Ward Binh Hung Hoa, Binh Tan District, Ho Chi Minh City

+84865399124